~~~~~~~~~~~~ IMPORTANT INFORMATION -- Please read! ~~~~~~~~~~~~

1. The "search..." box above searches the Docs & Forum Posts. The "Search" tab above just searches the Forum Posts. :side:
Please use these to search for your issue *before* creating a new message topic, as your issue may have been previously solved.
2. Please put your Club # and Club Web Address in your Forum Signature (best) OR in each post to get faster support from us.
Click here to edit your signature at the bottom of the Profile Information tab.
3. Our user and admin docs are available at: support.toastmastersclubs.org/doc "There's a doc for that!" ;)
4. There is an "Opt In" Feature for newly added members. The Opt In document explains the [strike]strikethrough[/strike] member information. Click Here to View the Post
5. When posting a New Topic , please include all relevant details and be specific. When did your issue 1st occur? What operating system, browser, & browser version are you using? Did you refresh your browser cache? Are your cookies enabled? Lastly, a screen shot is often helpful.
6. Please abide by the Terms of Use . We are volunteers contributing our spare time. We are happy to assist you, so long as you are respectful and courteous.
7. We are always looking for new FreeToastHost Ambassadors to join our team and support fellow Toastmasters in their use of the FreeToastHost website system. If you are familiar with the system and have some interest, send a Send Us a Private Message.

Pathways Project / Time option missing

More
5 years 6 months ago #78488 by allandpage
We're attempting to enter a project/time option for a member in our agenda, but the specific option is not there.

In the Effective Coaching path, Level 3, there is a mandatory project called "Reaching Consensus". There are two options for that project. Option 1 has a time of 23 minutes while option to is just 7 minutes. The evaluation form has both options, but the selection for agenda has just the first option.

Club #1976054
Attachments:
The topic has been locked.
More
5 years 6 months ago #78489 by Brian
Times on the Agenda are manual. Put what ever time is required for the role.
The time listed on the pull down is what we were told, if other time is required change it on the role.
The topic has been locked.
More
5 years 6 months ago #78490 by allandpage
Thank you Brian,
But time on the agenda is not the issue here. This project has two completely different options with different requirements, but only the first option is available for selection in FTH.

Allan
The topic has been locked.
More
5 years 6 months ago #78491 by SteveTheTechie
The topic has been locked.
More
5 years 6 months ago #78492 by allandpage
Thanks Steve. I checked, but don't see any change. Logged out then in again and full screen refresh, but no change.

This browser does not support PDFs. Please download the PDF to view it: Download PDF

This browser does not support PDFs. Please download the PDF to view it: Download PDF



I've added an attachment .pdf file that shows what I'm seeing in FTH as well as what I'm seeing on the two different evaluation forms.
Attachments:
The topic has been locked.
More
5 years 6 months ago #78493 by SteveTheTechie
Ok, I just realized that my changes are probably blocked from the IP address where I am at. I will have to do the update later this evening.
The topic has been locked.
Time to create page: 0.104 seconds