Toastmasters International — Club & District Websites
FreeToastHost 4

Support and Development Site

Forum index Recent topics

Adjust display of Projects "Evaluation & Feedback" and "Active Listening"

0 replies · 115 views

Dear FTH4 Team,

there are two projects which are doubled by showing to take a meeting role and the project for that role.

For example the project "Evaluation & Feedback" in Level 1 has the requirement to be an Evaluator. It is displayed for now as 3rd project (#3) in the level 1 section but it is also shown in the bottom, to take the Evaluator role (see attached picture). It is not intuitive to enroll myself as a speaker with the project Evaluator.
--> Improvement idea: Rename #3 in the project section to "Evaluation and Feedback #3 - Evaluator" so that it is clear what I am choosing there. And since it is part of the requirements for roles in Level 1 to be an Evaluator once, the box in the bottom where the roles are should be automatically marked as done, when the project is done. Otherwise I would add the note here too and name it "Evaluator (Project based)" or maybe "Evaluator "from Project E&F #3".

The second example is the level 3 project "Active Listening", where it is about to be a Topicsmaster, which is also mentioned as a role in the bottom.
--> Improvement idea: Check the box for the taken role as Topicsmaster automatically, when the project "Active Listening" is marked as done.

This can be some ideas if this sounds interesting to you too.

I was for now thinking about creating the role "Topicsmaster (project)" with the checkbox clicked that it counts as "prepared speech", so that I can select the project.
I as well created the role "Evaluator (project)" with the checkboxes "prepared speech" and "this role evaluates a prepared speech" marked. Like that I can select the project as well.

Best regards
Markus Ogrizek
Poland's First Toastmasters (1548)
  • Pathway screenshot.png

Log in to reply.