
Migrating to FTH4
Your club admin received the instructions to update their admin password to access FTH4. (FTH3 admin passwords will NOT work in FTH4). Follow the instructions in the email and use 'Member sign in' in the top right corner to access the Club Admin account.
If you are not sure who the club admin is, in your member account; look at 'Club Officers and Members' > "Club Email addresses". The LAST item in this list is the person who is currently listed as your club admin.
If this is not correct, please complete and submit this form to change your club admin:
www.toastmastersclubs.org/welcome/change-admin/
FTH agenda errors
- Maxi
-
Topic Author
- Offline
- New Member
-
- Posts: 3
- Thanks: 1
FTH agenda errors
8 years 2 months agoI am from club #3041 [Park Toastmasters, Ramsey, NJ]. We are Area 9 so recently started on Pathways. A number of our members have already started Pathways and I am concerned. When I tried to reconcile Pathways projects to our online agenda I noticed a number of inconsistencies. In several cases the number of required speeches are incorrect while in other cases the speech length is incorrect. I noticed you already quickly fixed one of the inaccuracies due to another member so I left that one off my list. Thank you for being so quick. I do not think anyone else brought the following inconsistencies to your attention. My original list [I attached it] goes Path by Path but I think it is harder due to repetitions. Therefore, I am trying to condense this list and letting you know the inconsistencies by level and Path [when not all are impacted].
Some of the projects require members to complete roles. I want these "new Pathway roles" added to our agenda even though they "look" like the same role - they are not. One Pathway role is TT Master and other role is evaluator. Each of these Pathways roles needs to be evaluated so the role is not really the same role as a regular TT master or evaluator. I added these agenda roles suggestions after the speaking section.
The following have inaccuracies in the Manual/Speech part of drop down menu.
Level 3 elective - all Paths - Deliver Social Speeches project. Project requires 2 speeches. Speech #1 (3-4 min) and Speech #2 (3-4 min). FTH meeting agenda incorrectly lists project as requiring one - 5-7 min speech.
Level 3 elective - all Paths - Focus on the Positive. Requires 1 speech but can do one or the other length speech, depending on circumstances. Deliver report type speech (3-4 min) if delivered on date of event (in club on date of event) or deliver informative speech (5-7 min) if delivered on different date in club. FTH meeting agenda incorrect as it only lists 5 to 7 min speech.
Level 3 elective for almost all paths for active listening project. Two Paths [Persausive Influence and Motivational Strategies] list this Active Listening as a required speech for Level 2 – Requires 1 speech but this is not a "manual" speech. See above and below. This is role of Table TopicsMaster showing active listening skills. While project is still 5-7 minutes in total, this is a Table Topics Master role. Please remove from speech area and see my suggestion below under Pathway role suggestions.
Level 4 elective – all Paths - Create a Podcast. Requires 1 speech (2-3 min). FTH meeting agenda incorrectly lists speech as 5-7 min instead of (2-3 min).
Level 4 elective – all Paths - Write a Compelling Blog. Requires 1 speech (2-3 min). FTH meeting agenda incorrectly lists speech length as 5-7 min.
Level 4 elective – all Paths - Manage Online Meetings. Does not appear to require a speech in club. According to project, evaluator must attend entire 20-25 min online meeting or webinar session (20-25 min). While no speech is required to be delivered in club I do not want you to remove this or we will lose the knowledge that this was completed. FTH meeting agenda incorrectly lists speech length as 5-7 min. Please change it to the length of the online meeting (20-25 min). I wish HQR added a required 2-3 min speech for the club but, since HQR only requires this online meeting or webinar, this suggestion is the best I can think of. If you can think of something else where clubs will not lose this project fulfillment on our agenda and our speech reports or role reports so we can check it was done, go for it.
Level 4 elective – all Paths (required for Innovative Planning) - Manage Projects Successfully. This project requires two speeches. About Plan Speech #1 (2-3 min); About Experience Speech #2 (5-7 min). FTH meeting agenda incorrectly only lists one required speech.
Level 5 – Required for all Paths - Reflect on Your Path. Current required speech length is incorrect. Project requires one speech (10-12 min) while FTH agenda is incorrect as it lists speech length as 5-7 min.
Level 5 elective – all Paths - Ethical Leadership project. Speech length is incorrect as it should be 20-40 min. FTH only lists one speech for 5-7 min.
Level 5 – most are electives but a few are required [required for Effective Coaching, Innovative Planning & Persausive Influence] – all Paths - High Performance Leadership [HPL]. HPL project requires delivering two speeches. Plan and Vision speech #1 (5-7 min); Results speech #2 (5-7 min). FTH online agenda incorrectly lists only one speech (5-7 min).
Agenda Role Changes:
I would like Active Listening to be removed from "Manual/Speech" area but added as a choice for another role on the agenda
- Brian
-
- Offline
- Administrator
-
- Posts: 14005
- Thanks: 4153
Re: FTH agenda errors
8 years 2 months agoYour VP Ed can create any roles they want in the club agenda. It is not a function we perform, whether a role is Pathways or not is not a requirement of the agenda, all of the requirements of every level of the Legacy Communication and Leader tracks were not listed in the agenda.
Brian McDonald DTM
Silver and Wiser Online Toastmasters Club #777940
Technical Support Consultant and Developer for FreeToastHost
- SteveTheTechie
-
- Offline
- Emeritus
-
- Posts: 11492
- Thanks: 3057
Re: FTH agenda errors
8 years 2 months ago - 8 years 2 months agoWe are not going to make specialized roles... your VPE can make any role they want. We do not define any specific roles in the agenda at all, we just provide settings that can be set for various roles that your VPE defines.Maxi wrote: Some of the projects require members to complete roles. I want these "new Pathway roles" added to our agenda even though they "look" like the same role - they are not. One Pathway role is TT Master and other role is evaluator. Each of these Pathways roles needs to be evaluated so the role is not really the same role as a regular TT master or evaluator. I added these agenda roles suggestions after the speaking section.
Thanks, this will get fixed.Maxi wrote: The following have inaccuracies in the Manual/Speech part of drop down menu.
Level 3 elective - all Paths - Deliver Social Speeches project. Project requires 2 speeches. Speech #1 (3-4 min) and Speech #2 (3-4 min). FTH meeting agenda incorrectly lists project as requiring one - 5-7 min speech.
I am not going to change this since it is the worst case that is displayed. As the times in the drop-down do not drive the actual times allocated in the agenda, the person doing the project still needs to be in communication with the VPE/Toastmaster to allocate time in the agenda.Maxi wrote: Level 3 elective - all Paths - Focus on the Positive. Requires 1 speech but can do one or the other length speech, depending on circumstances. Deliver report type speech (3-4 min) if delivered on date of event (in club on date of event) or deliver informative speech (5-7 min) if delivered on different date in club. FTH meeting agenda incorrect as it only lists 5 to 7 min speech.
Not changing this... it still needs a Evaluation.Maxi wrote: Level 3 elective for almost all paths for active listening project. Two Paths [Persausive Influence and Motivational Strategies] list this Active Listening as a required speech for Level 2 – Requires 1 speech but this is not a "manual" speech. See above and below. This is role of Table TopicsMaster showing active listening skills. While project is still 5-7 minutes in total, this is a Table Topics Master role. Please remove from speech area and see my suggestion below under Pathway role suggestions.
Thanks, this will get fixed.Maxi wrote: Level 4 elective – all Paths - Create a Podcast. Requires 1 speech (2-3 min). FTH meeting agenda incorrectly lists speech as 5-7 min instead of (2-3 min).
Thanks, this will get fixed.Maxi wrote: Level 4 elective – all Paths - Write a Compelling Blog. Requires 1 speech (2-3 min). FTH meeting agenda incorrectly lists speech length as 5-7 min.
Thanks, the time will get fixed.Maxi wrote: Level 4 elective – all Paths - Manage Online Meetings. Does not appear to require a speech in club. According to project, evaluator must attend entire 20-25 min online meeting or webinar session (20-25 min). While no speech is required to be delivered in club I do not want you to remove this or we will lose the knowledge that this was completed. FTH meeting agenda incorrectly lists speech length as 5-7 min. Please change it to the length of the online meeting (20-25 min). I wish HQR added a required 2-3 min speech for the club but, since HQR only requires this online meeting or webinar, this suggestion is the best I can think of. If you can think of something else where clubs will not lose this project fulfillment on our agenda and our speech reports or role reports so we can check it was done, go for it.
Thanks, this will get fixed.Maxi wrote: Level 4 elective – all Paths (required for Innovative Planning) - Manage Projects Successfully. This project requires two speeches. About Plan Speech #1 (2-3 min); About Experience Speech #2 (5-7 min). FTH meeting agenda incorrectly only lists one required speech.
Thanks, this will get fixed.Maxi wrote: Level 5 – Required for all Paths - Reflect on Your Path. Current required speech length is incorrect. Project requires one speech (10-12 min) while FTH agenda is incorrect as it lists speech length as 5-7 min.
Thanks, this will get fixed.Maxi wrote: Level 5 elective – all Paths - Ethical Leadership project. Speech length is incorrect as it should be 20-40 min. FTH only lists one speech for 5-7 min.
Thanks, this will get fixed.Maxi wrote: Level 5 – most are electives but a few are required [required for Effective Coaching, Innovative Planning & Persausive Influence] – all Paths - High Performance Leadership [HPL]. HPL project requires delivering two speeches. Plan and Vision speech #1 (5-7 min); Results speech #2 (5-7 min). FTH online agenda incorrectly lists only one speech (5-7 min).
Thanks, but I am not going to make major changes to the design of the agenda functionality. I will see what I can do to make it more accommodating, but do not count on changes for this.Maxi wrote: Agenda Role Changes:
I would like Active Listening to be removed from "Manual/Speech" area but added as a choice for another role on the agenda. I want it be listed separately in the role report as they are different requirements. Please ensure it is clear that TT Master role meets Pathway requirements when it is Active Listening project; it needs to be marked as a different sort of TT Master role that needs evaluation. All members must complete 3 roles at least once before they are promoted to L4 - toastmaster, TT Master and evaluator. However, TT Master does not have to be active listening project. Thus, we need 2 types of TT Master roles.
Likewise, all members must complete level 1 in Pathways. Second project is Evaluation & Feedback which requires 3 speeches. E&F speech # 3 is 2-3 min because it is the member taking on role of evaluator by evaluating another member’s manual speech. Currently, there is nothing in the agenda to indicate it was fulfilled. This role should be in the role report as Evaluator - L1 E&F Speech #3 or similar so it flows into role report and we can count it both as role of evaluator role and Path L1 E&F speech #3. This is one of the required roles to advance to Level 4 award.
- Maxi
-
Topic Author
- Offline
- New Member
-
- Posts: 3
- Thanks: 1
Re: FTH agenda errors
8 years 2 months agoMaxine
- SteveTheTechie
-
- Offline
- Emeritus
-
- Posts: 11492
- Thanks: 3057
Re: FTH agenda errors
8 years 2 months ago - 8 years 2 months ago- Maxi
-
Topic Author
- Offline
- New Member
-
- Posts: 3
- Thanks: 1
Re: FTH agenda errors
8 years 2 months agoLatest Forum Posts
-
- Assign Officers, Set up to three roles.
- In Public Forums / FTH4 Suggestions and Improvements
- by Brian
- 23 minutes ago
-
- Using VPN
- In Public Forums / FTH4 Support
- by Brian
- 24 minutes ago
-
- Linking Role Names when Assigning a Member
- In Public Forums / FTH4 Support
- by Danny613630
- 2 hours 54 minutes ago
-
- Update a member's email address
- In Public Forums / FTH4 Support
- by Wilkinson
- 6 hours 21 minutes ago
-
- Agenda email: default Reply-To goes to personal em...
- In Public Forums / FTH4 Suggestions and Improvements
- by steffan
- 8 hours 5 minutes ago
Copyright © 2026 FreeToastHost 4 Support. All Rights Reserved.
Site hosting and technical support provided by FreeToastHost, a free service of Toastmasters International.
The information on this website is for the sole use of Toastmasters’ members, for Toastmasters business only. Toastmasters International, the Toastmasters International logo and all other Toastmasters International trademarks and copyrights are the sole property of Toastmasters International and may be used only by permission.