Migrating to FTH4

Your club admin received the instructions to update their admin password to access FTH4. (FTH3 admin passwords will NOT work in FTH4). Follow the instructions in the email and use 'Member sign in' in the top right corner to access the Club Admin account.

If you are not sure who the club admin is, in your member account; look at 'Club Officers and Members' > "Club Email addresses". The LAST item in this list is the person who is currently listed as your club admin.

If this is not correct, please complete and submit this form to change your club admin:
www.toastmastersclubs.org/welcome/change-admin/

Pathways speech Project

  • PAL
  • PAL's Avatar Topic Author
  • Offline
  • New Member
  • New Member
  • Posts: 1
  • Thanks: 0

Pathways speech Project

7 years 2 months ago
#76635
Good evening,
This is Patricia from Toastmasters at the Lake, Mooresville, NC.
When I attempt to choose a Path, the Path Populates, however when I try to choose the Level and Project, the curser jumps back to a prior speech Level... I had to just put on the FTH site what it defaulted to and then choose the manual and project detail form the Toastmaster International Pathways site for Project and Evaluation... Is this something that can be corrected, or am I missing a step in my project from TI.
Thanks for your response.
Patricia Lisun
PatriciaToastMasters@gmail.com
The topic has been locked.
  • SteveTheTechie
  • SteveTheTechie's Avatar
  • Offline
  • Emeritus
  • Emeritus
  • Posts: 11492
  • Thanks: 3057

Re: Pathways speech Project

7 years 2 months ago
#76640
We always require your club number as many clubs share the same name and our system is tied to club numbers, not club names.
The topic has been locked.
  • SteveTheTechie
  • SteveTheTechie's Avatar
  • Offline
  • Emeritus
  • Emeritus
  • Posts: 11492
  • Thanks: 3057

Re: Pathways speech Project

7 years 2 months ago - 7 years 2 months ago
#76641
Ok, so the system figures out both the Path and the Project whenever you just pick a project from the appropriate path in the pop-up, because they are stored together in the system that way.

If you pay close attention to the pop-up, you will see that it is arranged like an outline with the Paths as the top-level, and the projects in each Path as the next level "down".

Just pick the appropriate project in the appropriate path from the pop-up list and you should see that the path is also set. You do not need to pick both.

Bottom Line: You only need to pick one thing that sets two things.
Last edit: 7 years 2 months ago by SteveTheTechie.
The topic has been locked.
Moderators: Brian, Heni, Pam, RichardT, NotLiable, NSB, jgavin, Lcala305, peterb323, DebbieT
Time to create page: 0.218 seconds

Latest Forum Posts