~~~ Please read before posting. ~~~

Important: We need your Club Number at a minimum, and as many details as possible.
For further info please read This page before posting.

L5, Lead in Any Situation - path/time droplist doesn't match description's time

  • desplainestoastmasters
  • desplainestoastmasters's Avatar Topic Author
  • Offline
  • Senior Member
  • Senior Member
  • Posts: 67
  • Thanks: 9

L5, Lead in Any Situation - path/time droplist doesn't match description's time

6 years 9 months ago
#72886
L5, Lead in Any Situation description file shows speech time as 8-10 min, but Project/Time droplist shows it as 5-7 min.
(Team Collaboration and Dynamic Leadership are the only two paths containing the "Lead in Any Situation" project, and the error.).

Happy Holiday from snowy Chicago (8" overnight with 2" more before tomorrow)
The topic has been locked.
  • SteveTheTechie
  • SteveTheTechie's Avatar
  • Offline
  • Administrator
  • Administrator
  • Posts: 11526
  • Thanks: 3050

Re: L5, Lead in Any Situation - path/time droplist doesn't match description's time

6 years 9 months ago
#72889
fixed
The topic has been locked.
Moderators: BrianJane AtkinsonPamrhtaylor3marc33NotLiablejgavinLcala305peterb323
Time to create page: 0.242 seconds