- Posts: 1
- Thank you received: 0
Pathways speech Project
5 years 11 months ago #76635
by PAL
Pathways speech Project was created by PAL
Good evening,
This is Patricia from Toastmasters at the Lake, Mooresville, NC.
When I attempt to choose a Path, the Path Populates, however when I try to choose the Level and Project, the curser jumps back to a prior speech Level... I had to just put on the FTH site what it defaulted to and then choose the manual and project detail form the Toastmaster International Pathways site for Project and Evaluation... Is this something that can be corrected, or am I missing a step in my project from TI.
Thanks for your response.
Patricia Lisun
PatriciaToastMasters@gmail.com
This is Patricia from Toastmasters at the Lake, Mooresville, NC.
When I attempt to choose a Path, the Path Populates, however when I try to choose the Level and Project, the curser jumps back to a prior speech Level... I had to just put on the FTH site what it defaulted to and then choose the manual and project detail form the Toastmaster International Pathways site for Project and Evaluation... Is this something that can be corrected, or am I missing a step in my project from TI.
Thanks for your response.
Patricia Lisun
PatriciaToastMasters@gmail.com
The topic has been locked.
- SteveTheTechie
- Offline
- Administrator
-
Less
More
- Posts: 11526
- Thank you received: 3050
5 years 11 months ago #76640
by SteveTheTechie
Replied by SteveTheTechie on topic Pathways speech Project
We always require your club number as many clubs share the same name and our system is tied to club numbers, not club names.
The topic has been locked.
- SteveTheTechie
- Offline
- Administrator
-
Less
More
- Posts: 11526
- Thank you received: 3050
5 years 11 months ago - 5 years 11 months ago #76641
by SteveTheTechie
Replied by SteveTheTechie on topic Pathways speech Project
Ok, so the system figures out both the Path and the Project whenever you just pick a project from the appropriate path in the pop-up, because they are stored together in the system that way.
If you pay close attention to the pop-up, you will see that it is arranged like an outline with the Paths as the top-level, and the projects in each Path as the next level "down".
Just pick the appropriate project in the appropriate path from the pop-up list and you should see that the path is also set. You do not need to pick both.
Bottom Line: You only need to pick one thing that sets two things.
If you pay close attention to the pop-up, you will see that it is arranged like an outline with the Paths as the top-level, and the projects in each Path as the next level "down".
Just pick the appropriate project in the appropriate path from the pop-up list and you should see that the path is also set. You do not need to pick both.
Bottom Line: You only need to pick one thing that sets two things.
Last edit: 5 years 11 months ago by SteveTheTechie.
The topic has been locked.
Time to create page: 0.126 seconds
Copyright © 2025 FreeToastHost 3 Support. All Rights Reserved.