Migrating to FTH4

Your club admin received the instructions to update their admin password to access FTH4. (FTH3 admin passwords will NOT work in FTH4). Follow the instructions in the email and use 'Member sign in' in the top right corner to access the Club Admin account.

If you are not sure who the club admin is, in your member account; look at 'Club Officers and Members' > "Club Email addresses". The LAST item in this list is the person who is currently listed as your club admin.

If this is not correct, please complete and submit this form to change your club admin:
www.toastmastersclubs.org/welcome/change-admin/

Pathways Project Time Requirements Update - Managing a Difficult Audience

  • DramaDr
  • DramaDr's Avatar Topic Author
  • Offline
  • Senior Member
  • Senior Member
  • Posts: 49
  • Thanks: 2

Pathways Project Time Requirements Update - Managing a Difficult Audience

7 years 11 months ago
#72744
I know there have been other threads addressing updates to Pathways Projects on the agenda, but the ones I reviewed were locked for further comments.

I have a member who is about to present the Managing a Difficult Audience Project and is confused about the timing. She is to prepare and present a 5-7 minute speech, but she also must handle audience disruptions. According to the project guidelines she has 10-15 minutes to both present her speech and pause to handle disruptions.

On the agenda, it says the timing requirements are 5-7 minutes, but based on the project that is for the speech only and isn't including time needed to handle disruptions.

I have attached the evaluation resource for this project as support.

Can this please be updated for the agendas?
The topic has been locked.
  • Brian
  • Brian's Avatar
  • Offline
  • Administrator
  • Administrator
  • Posts: 14028
  • Thanks: 4159

Re: Pathways Project Time Requirements Update - Managing a Difficult Audience

7 years 11 months ago
#72748
The times listed in the projects are comments and do not affect the length of time on the Agenda, never has.
We can change the comment but the VPED will have to change the timing on the agenda.
Thank you,

Brian McDonald DTM
Silver and Wiser Online Toastmasters Club #777940

Technical Support Consultant and Developer for FreeToastHost
The topic has been locked.
  • DramaDr
  • DramaDr's Avatar Topic Author
  • Offline
  • Senior Member
  • Senior Member
  • Posts: 49
  • Thanks: 2

Re: Pathways Project Time Requirements Update - Managing a Difficult Audience

7 years 11 months ago
#72752
Let me clarify . . .

I am talking about the time requirements that are listed in parentheses next to the project name in the drop down list.

But nevermind anyway. I just pulled up the website to screenshot what I am talking about and it now says 10-15 minutes. I don't know if that was changed (based on your comment below) or if I was looking at a different project with a similar name.
The topic has been locked.
  • Brian
  • Brian's Avatar
  • Offline
  • Administrator
  • Administrator
  • Posts: 14028
  • Thanks: 4159

Re: Pathways Project Time Requirements Update - Managing a Difficult Audience

7 years 11 months ago
#72753
Some 5hings are easy to change
Thank you,

Brian McDonald DTM
Silver and Wiser Online Toastmasters Club #777940

Technical Support Consultant and Developer for FreeToastHost
The following user(s) said Thank You: SteveTheTechie
The topic has been locked.
Moderators: Brian, Heni, Pam, RichardT, NotLiable, NSB, jgavin, Lcala305, peterb323, DebbieT
Time to create page: 0.148 seconds

Latest Forum Posts