
~~~ Please read before posting. ~~~
Important: We need your Club Number at a minimum, and as many details as possible.
For further info please read
This page
before posting.
Pathways Project / Time option missing
- allandpage
-
Topic Author
- Offline
- Senior Member
-
- Posts: 40
- Thanks: 2
Pathways Project / Time option missing
5 years 10 months ago
We're attempting to enter a project/time option for a member in our agenda, but the specific option is not there.
In the Effective Coaching path, Level 3, there is a mandatory project called "Reaching Consensus". There are two options for that project. Option 1 has a time of 23 minutes while option to is just 7 minutes. The evaluation form has both options, but the selection for agenda has just the first option.
Club #1976054
In the Effective Coaching path, Level 3, there is a mandatory project called "Reaching Consensus". There are two options for that project. Option 1 has a time of 23 minutes while option to is just 7 minutes. The evaluation form has both options, but the selection for agenda has just the first option.
Club #1976054
The topic has been locked.
- Brian
-
- Offline
- Administrator
-
- Posts: 10958
- Thanks: 3647
Re: Pathways Project / Time option missing
5 years 10 months ago
Times on the Agenda are manual. Put what ever time is required for the role.
The time listed on the pull down is what we were told, if other time is required change it on the role.
The time listed on the pull down is what we were told, if other time is required change it on the role.
Thank you,
Brian McDonald DTM
Silver and Wiser Online Toastmasters Club #777940
Technical Support Consultant for FreeToastHost
Brian McDonald DTM
Silver and Wiser Online Toastmasters Club #777940
Technical Support Consultant for FreeToastHost
The topic has been locked.
- allandpage
-
Topic Author
- Offline
- Senior Member
-
- Posts: 40
- Thanks: 2
Re: Pathways Project / Time option missing
5 years 10 months ago
Thank you Brian,
But time on the agenda is not the issue here. This project has two completely different options with different requirements, but only the first option is available for selection in FTH.
Allan
But time on the agenda is not the issue here. This project has two completely different options with different requirements, but only the first option is available for selection in FTH.
Allan
The topic has been locked.
- SteveTheTechie
-
- Offline
- Administrator
-
- Posts: 11526
- Thanks: 3050
The topic has been locked.
- allandpage
-
Topic Author
- Offline
- Senior Member
-
- Posts: 40
- Thanks: 2
Re: Pathways Project / Time option missing
5 years 10 months ago
Thanks Steve. I checked, but don't see any change. Logged out then in again and full screen refresh, but no change.
I've added an attachment .pdf file that shows what I'm seeing in FTH as well as what I'm seeing on the two different evaluation forms.
This attachment is hidden for guests.
Please log in or register to see it.
Please log in or register to see it.
This attachment is hidden for guests.
Please log in or register to see it.
Please log in or register to see it.
I've added an attachment .pdf file that shows what I'm seeing in FTH as well as what I'm seeing on the two different evaluation forms.
The topic has been locked.
- SteveTheTechie
-
- Offline
- Administrator
-
- Posts: 11526
- Thanks: 3050
Re: Pathways Project / Time option missing
5 years 10 months ago
Ok, I just realized that my changes are probably blocked from the IP address where I am at. I will have to do the update later this evening.
The topic has been locked.
Moderators: Brian, Pam, rhtaylor3, marc33, NotLiable, NSB, jgavin, Heni, Lcala305, peterb323, DebbieT
Time to create page: 0.430 seconds
Copyright © 2025 FreeToastHost 3 Support. All Rights Reserved.