~~~ Please read before posting. ~~~

Important: We need your Club Number at a minimum, and as many details as possible.
For further info please read This page before posting.

Errors in Project / Time Drop Down

  • Crimson Toastmaster
  • Crimson Toastmaster's Avatar Topic Author
  • Offline
  • New Member
  • New Member
  • Posts: 5
  • Thanks: 1

Errors in Project / Time Drop Down

4 years 7 months ago - 4 years 7 months ago
#82701
In the Project / Time dropdown menu, under PATHWAYS - Effective Coaching, the project times are reversed for (L1) Evaluation and Feedback #3 (5-7 min) and (L1) Researching and Presenting (2-3 min). Evaluation and Feedback #3 is a 2-3 minute speech evaluation. Researching and Presenting is a 5-7 minute speech. Thank you.

Michèle Biscoe, DTM
Crimson Toastmasters (# 977250)
crimson.toastmastersclubs.org/
Michèle Biscoe, DTM
Crimson Toastmasters Club (977250)
crimson.toastmastersclubs.org/

Attachments:

Last edit: 4 years 7 months ago by Crimson Toastmaster. Reason: club web address; file attachment
The following user(s) said Thank You: Pam
The topic has been locked.
  • Pam
  • Pam's Avatar
  • Offline
  • Administrator
  • Administrator
  • Posts: 3775
  • Thanks: 1039

Re: Errors in Project / Time Drop Down

4 years 7 months ago
#82702
Thanks - fixed :)
FreeToastHost Ambassador
VPE HOT Toastmasters 2025-2026 hot.toastmastersclubs.org/
Webmaster Redlands Toastmasters 2025-2026 redlands.toastmastersclubs.org/
The following user(s) said Thank You: Crimson Toastmaster
The topic has been locked.
Moderators: BrianJane AtkinsonPamrhtaylor3marc33NotLiablejgavinLcala305peterb323
Time to create page: 0.144 seconds